Chức danh/Vị trí: Project manager

Chia sẽ:
Nguyễn Anh Khoa

Nguyễn Anh Khoa

Ngày sinh: 27-08-1985

Giới tính: Nam - Đã kết hôn

Quốc gia: Viet Nam

Điện thoại: 0908727017

Địa chỉ: 62/11/14 Đường 30/4, Phường Quyết Thắng, Biên Hòa, Đồng Nai

Email: nguyenanhkhoa278@gmail.com

Thông tin nghề nghiệp
8 năm
Quản lý
Đại học
English - Cao cấp
Quản lý
Dầu khí / Hóa chất, Hàng hải / Tàu biển
Từ 80 đến 100 triệu
Bà Rịa Vũng Tàu, Hồ Chí Minh, Đà Nẵng
Nhân viên chính thức
12/10/2023
Mục tiêu nghề nghiệp

- I have worked for my existing company for last 8 year and I am looking forward to take challenge as well as take new opportunity for working in a new organizational structure or environment.

Kinh nghiệm làm việc

* Career history:

- Sep 2009 - Till now: Triyards Saigon Shipyard “SSY” in HCM City, Viet Nam.

- Jan 2014 - Now: Project manager/ Project department.

- To manage as project manager during construction and design phase for H1063 GSI GTV - a diesel electric propulsion vessel designed as a special-purpose geotechnical and oceanographic survey operations in coastal areas with drop keel for SONAR transducer mounting and Vibro corer & drill tower for corering system (Staring from Jan 2017 to Jan 2019 for Geological Survey of India).

- To manage as project manager during construction and design phase for H1058 IMT2001 - a diesel electric propulsion vessel designed as a special-purpose oceanographic survey operations in worldwide & deep sea area with gondola for SONAR transducer mounting and Vibro corer & piston corer for corering system (Starting from Dec 2015 to Oct 2017 for Taiwan Ocean Research Institute).

- To manage as project manager for X2008 Siemens HRSG (Heat Stream Recovery Generators) Pengerang for non-pressure part/ steel structure including boiler main frame; stair towers; stack; boiler casing and lifting devices with total weight approx. 5,200MT and contract value approx. EUR 10 million (Delivery from July 2015 - May 2016 to Siemens Austria).

- To manage as project manager for H1017/1018 BH335-L3P DP1 liftboat project (3 x 335ft tubular leg) with total light ship weight approx. 5,500MT and contract value approx. USD 60 million (Delivery in Dec 2015 to Teras Offshore).

- To manage as project manager for H1025 BH300-L4T liftboat project (4 x 300ft truss leg) with total light ship weight approx. 4,500MT and contract value approx. USD 65 million (Delivery in Dec 2015 to Teras Offshore).

- To manage as co-project manager for H1028/1029 M300-4 class DP2 liftboat (4 x 300ft tubular leg) with total light ship weight approx. 5,500MT (Delivery in July 2016 to Falcon Global/ Montco & Seacor joint venture).

- To be reassigned to manage and lead the furniture workshop to provide the services for in-house Triyards and also 3rd party client for furniture including the marketing for the furniture product to 3rd party client.

- Jan 2012 - Dec 2013: Assistant project manager/ Project department

- To manage as assist project manager for H1012/1016 BH450-L3T DP1 liftboat project (3 x 450ft truss leg) with total lightship weight approx.. 7,700MT (Delivery in Jan & May 2014 to Teras Offshore).

- To set up and manage the Furniture fabrication workshop which have successfully fabricated and furnished for H1012&H1016 BH450 liftboat prior to handover to Marine Accommodation’s head of department.

- Jan 2011 - Dec 2012: Project superintendent/ Project department

- To manage as Project Superintendent for H1012/1016 BH450-L3T DP1 liftboat project (3 x 450ft truss leg) prior to be promoted as Asst. Project Manager for these two projects.

- To manage as project superintendent for H0706A/H1005/H0706B Levingston E320 class DP1 liftboat (the 4th – 6th unit of series 3 x 320ft tubular leg) with total light ship weight approx.. 6,000MT (Delivery in 2011 to 2012 to Emas Offshore and Teras Offshore).

- To manage as project superintendent for H0903 6,000DWT DP1 Oil Tanker with total lightship weight approx. 6,000 MT (Delivery in 2011 to Emas Offshore).

- To manage as repair superintendent for the following vessel: Lewek Hercules - Load Out Barge: To up-slip and convert the load out barge 72m(L) x 42m(W) x 6.5m(H) to floating dock & submersible barge under ABS class 100m(L) x 52.5m(W) x 5m(H).

- Lewek Falcon - MPSV Ultra deepwater Subsea construction DP2: To carry out the retrofit including to remove the dry bulk tanks; installation the 150T crane winch; installation 150T Macgregor Knuckle crane on main deck; including ROV launch and recovery system “LARS” installation and load test at ROV garage.

- Lewek Fulmar - MPSV Ultra deepwater Subsea construction DP2: to carry out the retrofit including installation the 350T A-Frame including foundation and reinforcement.

- EMAS SUBSEA: To provide the miscellaneous base services for EMAS ROV to overhaul and install the ROV system on Lewek Ambassador and Lewek Falcon during repair at Triyards SSY.

- Jan 2011 - Dec 2011: Project supervisor/ Production department

- To manage as production supervisor for the following vessels: To manage as project superintendent for H0705/H0706A Levingston E320 class DP1 liftboat (the 3th – 4th unit of series 3 x 320ft tubular leg) with total light ship weight approx.. 6,000MT (Delivery in 2011 to Teras Offshore) prior to be promoted as project superintendent for these vessels.

- To manage as repair supervisor for the following vessels: Lewek Altair - PSV/DP2: To carry out the 60T AHC TTS crane removal and other outfitting structure installation.

- Lewek Merlin - AHTS/FiFi1/DP2: To carry out the piping system modification.

- Lewek Mallard - AHTS/FiFi1/DP1: To provide the services for engine overhauling including pipe system modification.

- Sep 2009 - June 2010: Training production foremen/ Outfitting department.

Trình độ học vấn và quá trình học tập

- Academic qualification.

- University certification: Certification of naval architecture from Ho Chi Minh City of Transportation University in Ho Chi Minh City from 2004 - 2009.

Kỹ năng chuyên môn

* Professional skill:

- Good at Microsoft Office including Microsoft Project.

- Good at ACAD 2D drawing.

- Good at English communication including speaking; reading and writing.

* Miscellaneous:

- Internal training for risk assessment analysis by EMAS HSEQ in 2011.

- Certification of Safety Instruction for Ship Repair Manager Course certified by Global Vision & Critical Management in July 2011.

- Basic and Professional Microsoft Project training in 2012.

- Effective Business Writing skill training by CTS in Nov 2013.

- ISO 9001, 14001, BS OHSAS 18001 Awareness & Internal Auditing Skills by BSI in June 2014.

- ISO 9001, 14001, BS OHSAS 18001 Awareness for new version 2015 by BSI in 2016.

- People management workshop training by CTS in Feb 2016.

- Certification of Project Management Body of knowledge (PMBOK) 35 PDUs certified by STEVEBROS/ PMI® in Oct 2014 & Renew 35 PDUs training in March 2017.

Thành tích nổi bật

- I have used to be head of furniture workshop to manage from setting up till full operation which is any second duty assignment by company besides the marine EPC newbuilding project manager duty.

- I am currently being marine EPC newbuilding project manager as well as head of project management department from Jan 2014 until now.

...

WORKBANK.VN - Ngân hàng việc làm trực tuyến hàng đầu Việt Nam, luôn cập nhật thông tin việc làm mới nhất trên toàn quốc, được thành lập năm 2008.

Giới thiệu
Thỏa thuận sử dụng
Quy chế hoạt động
Chính sách bảo mật thông tin
Cơ chế giải quyết tranh chấp

Liên hệ

Phone:
028.6264.9264 / 028.6264.9283
Mobile:
0913.49.71.71 - 0974.906.609
Email:
support@workbank.vn
Địa chỉ:
Xem bản đồ
Hợp tác đầu tư:
0983.852.025

Copyright © by WORKBANK.VN. All right reserved. Giấy tiếp nhận: 246/PTTH&TTĐT của Cục PTTH-TTĐT cấp ngày 7/11/2008.

Công Ty Cổ Phần Truyền Thông Phan Quang - GPKD: 0303685627 - Do Sở Kế hoạch và Đầu tư TP.HCM - Cấp ngày: 10/03/2005

Trụ sở: 343/42 Sư Vạn Hạnh, Phường 12, Quận 10, TP. HCM - Điện thoại: 028.6264.9264 - 028.6264.9283